Project Approach

A systematic approach to all projects ensures the highest quality solutions.

Cybertrol practices a system development life cycle approach to all projects following these hardware and software design procedures:

  1. Detailed review and development of system Functional Requirements — Reviewed and approved before design phase
  2. Hardware and Software Design Module Development
  3. Detailed Build, Configuration and Software Programming
  4. Internal Hardware and Software Testing with Testing Procedures
  5. Factory Acceptance Testing with Customers
  6. System Commissioning

Peer design reviews are held at key points throughout a project. The system is designed with the combined experience of Cybertrol.

The result is a modular, scalable, seamlessly integrated system that will provide a lower cost of ownership through ease of operation and maintenance.


"Cybertrol can take pride in knowing they were instrumental in completing a project for us that has received much praise from both our executives and our board of directors."
Cereal Foods Company